Padel Court Construction
- Padel Court Factory

- Jul 15
- 1 min read
As the global demand for padel rises, many sports clubs, resorts, and entrepreneurs are investing in padel court construction. But what does it take to build a court that’s durable, certified, and visually impressive?
Let’s explore the key stages of building a professional padel court.
1️⃣ Padel Court Dimensions and Design
Standard court size: 20 meters long x 10 meters wide
Types of courts:
Classic Padel Court
Panoramic Padel Court
Indoor or Outdoor Variants
Professional courts must comply with International Padel Federation (FIP) regulations. At Padel Court Factory, all our courts meet global standards.
2️⃣ Padel Court Construction Phases
Step-by-step breakdown:
Site preparation (ground leveling, concrete slab)
Steel structure assembly (galvanized & powder-coated)
Glass panel installation (10mm–12mm tempered glass)
Padel turf laying (FIP-approved turf in blue, green, clay colors)
Lighting & electrical installation
Final testing and quality control
3️⃣ Materials Used
✅ Hot-dip galvanized steel
✅ Electro-welded mesh panels
✅ Tempered safety glass (EN12150 CE Certified)
✅ UV-resistant artificial turf
✅ LED lighting systems
✅ Anti-injury design elements
Only premium, weather-resistant materials are used to ensure durability and safety.
4️⃣ Installation Time and Cost
Installation time: 5–7 days per court
Average cost: €18,000–€35,000 depending on type and location
Optional add-ons: Branding, roofing, spectator seats, extra lighting
We offer factory pre-assembled parts for faster installation and lower on-site costs.
5️⃣ Why Choose Padel Court Factory?
Delivered to 30+ countries
In-house design, production, and logistics
Robotic welding and powder-coating systems
Turnkey solutions with installation team support
Custom colors and branding options
📞 Contact Us for a Free Quote
Ready to build your padel court?
We handle everything from design to delivery, worldwide.



Comments